Labor hour answers / Residential AV / Smart Home
Dedicated home theater, 7.2.4: how many labor hours?
A sample range for this job (Dedicated home theater, 7.2.4) is 46 to 94 labor hours. Where a job lands in that range depends on three things: what stage is construction at, what is the display and how much control and calibration.
These are illustrative figures for a job of this size, not a quote. Your own numbers depend on your crew, your sites and how you work.
What moves the number
What stage is construction at?
- Open framingno change
- Drywall is up, there is attic access+8h
- Finished room, fishing walls+18h
What is the display?
- A flat panelno change
- Projector and fixed screen+6h
- Projector and motorized masking screen+12h
How much control and calibration?
- A basic remoteno change
- Control system programming+10h
- Programming plus audio and video calibration+18h
Where the hours go
The simplest version of this job, 46 hours, split across the phases a shop in this trade typically runs.
- Design & Proposal7h
- Pre-Wire13.5h
- Trim-Out7h
- Rack & Equipment Install11.5h
- Calibration & Client Walkthrough7h
Scope this job yourself
Answer the three questions above and get the estimate by phase in about a minute. DarkBird does this for every job your shop quotes, from labor templates you own, and corrects them from the hours your team books.