Labor hour answers / Low-Voltage / Structured Cabling
Cat6A cabling, 120 drops, tenant fit-out: how many labor hours?
A sample range for this job (Cat6A cabling, 120 drops, tenant fit-out) is 140 to 224 labor hours. Where a job lands in that range depends on three things: what is the cable pathway, what kind of ceiling and what testing is required.
These are illustrative figures for a job of this size, not a quote. Your own numbers depend on your crew, your sites and how you work.
What moves the number
What is the cable pathway?
- Existing cable trayno change
- J-hooks, we install them+16h
- Conduit stubs and long home runs+30h
What kind of ceiling?
- Open or lay-in tileno change
- Some hard-lid areas+14h
- Mostly hard lid+32h
What testing is required?
- Wire map only−10h
- Certification with a standard reportno change
- Certification, as-builts and warranty registration+12h
Where the hours go
The simplest version of this job, 140 hours, split across the phases a shop in this trade typically runs.
- Site Survey7h
- Cable Rough-In70h
- Device & Equipment Install14h
- Termination & Testing42h
- Closeout & Documentation7h
Scope this job yourself
Answer the three questions above and get the estimate by phase in about a minute. DarkBird does this for every job your shop quotes, from labor templates you own, and corrects them from the hours your team books.