Labor hour answers / Building Automation / Controls

VAV zone controls, 40 boxes: how many labor hours?

A sample range for this job (VAV zone controls, 40 boxes) is 140 to 256 labor hours. Where a job lands in that range depends on three things: how do the controllers arrive, what is the controls network and who handles air balancing.

These are illustrative figures for a job of this size, not a quote. Your own numbers depend on your crew, your sites and how you work.

What moves the number

How do the controllers arrive?

  • Factory mounted−30h
  • We mount them in the fieldno change
  • We mount them above an occupied ceiling+34h

What is the controls network?

  • An existing BACnet MS/TP trunkno change
  • A new MS/TP trunk+16h
  • New IP controllers and switches+24h

Who handles air balancing?

  • Othersno change
  • We assist the balancer+12h
  • We set flows and document them+28h

Where the hours go

The simplest version of this job, 140 hours, split across the phases a shop in this trade typically runs.

  • Engineering & Submittals21h
  • Panel Fabrication21h
  • Field Installation49h
  • Point-to-Point Checkout28h
  • Commissioning & Turnover21h

Scope this job yourself

Answer the three questions above and get the estimate by phase in about a minute. DarkBird does this for every job your shop quotes, from labor templates you own, and corrects them from the hours your team books.