Labor hour answers / Building Automation / Controls
VAV zone controls, 40 boxes: how many labor hours?
A sample range for this job (VAV zone controls, 40 boxes) is 140 to 256 labor hours. Where a job lands in that range depends on three things: how do the controllers arrive, what is the controls network and who handles air balancing.
These are illustrative figures for a job of this size, not a quote. Your own numbers depend on your crew, your sites and how you work.
What moves the number
How do the controllers arrive?
- Factory mounted−30h
- We mount them in the fieldno change
- We mount them above an occupied ceiling+34h
What is the controls network?
- An existing BACnet MS/TP trunkno change
- A new MS/TP trunk+16h
- New IP controllers and switches+24h
Who handles air balancing?
- Othersno change
- We assist the balancer+12h
- We set flows and document them+28h
Where the hours go
The simplest version of this job, 140 hours, split across the phases a shop in this trade typically runs.
- Engineering & Submittals21h
- Panel Fabrication21h
- Field Installation49h
- Point-to-Point Checkout28h
- Commissioning & Turnover21h
Scope this job yourself
Answer the three questions above and get the estimate by phase in about a minute. DarkBird does this for every job your shop quotes, from labor templates you own, and corrects them from the hours your team books.